Renault Megane, Scenic

Since 1996 of release

Repair and car operation



Reno Megan, Stsenik
+ Cars of mark Renault Megane
+ Maintenance service
+ Engine repair
+ System of cooling, heating
- Power supply systems, release
   + Fuel and an exhaust system - petrol models
   - Fuel and exhaust systems - diesel models
      Removal and installation of a casing of the air filter
      Removal and installation of the gauge of a stock of fuel
      Removal and installation of a fuel tank
      Removal, installation and adjustment of a rope of gas
      Removal and installation of a pedal of gas
      Pouring and prorolling of fuel system
      Check and adjustment of the maximum turns of the engine
      Removal, installation, check and adjustment of a thermodrive and rope of fast idling
      Removal, installation, check and adjustment of components of system of fast idling
      Check, removal and installation of the proof-reader of the moment of injection at cold start
      The description, removal and valve installation отсечки fuel
      Removal and installation of the gauge of temperature of fuel
      Removal and installation of the fuel pump
      Methods of check and adjustment of the moment of injection
      Check and adjustment of the moment of injection
      Check, removal and installation of atomizers
      Removal and installation of the inlet pipeline and final collector
      Check and adjustment of turns of idling and delay turns
      turbocharger - the description and precautions
      Removal and installation турбокомпрессора
      Survey and service турбокомпрессора
      Removal and installation интеркулера (models with turbocharger)
      The general description and replacement of components of final system
   + Systems of decrease in toxicity of the fulfilled gases
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
3bf7a351




Removal, installation, check and adjustment of components of system of fast idling

The following procedure is applicable only to models with engine F8Q. On engines F9Q fast idling is supervised by the electronic module of system of injection and any additional adjustments it is not required.

VACUUM DRIVE AND ROPE

 REMOVAL

1. The vacuum drive is fixed on an arm established on the end of the fuel pump.
2. Loosen the the screw or a nut also remove a tip from a rope on the lever of fast idling on the fuel pump.
3. Disconnect a vacuum hose from a drive.

4a. A vacuum drive of fast idling 1 - pump Bosch.

4b. A vacuum drive of fast idling 1 - pump Lucas.

5. Turn away a nut, крепящую a drive to an arm, and get a drive, passing a rope through an arm (address to illustrations).


 INSTALLATION

1. Establish a drive on an arm and tighten a fixing nut.
2. Connect a vacuum hose.
3. Insert a rope through the lever of fast idling and place a tip on a rope, but do not clamp while the screw or a nut.
4. Adjust a rope as it is described in following paragraphs.


CHECK AND ADJUSTMENT - FUEL PUMP BOSCH

1. Operate as it is described in Section 9 and being guided by the note in the beginning, the distance between edge the lever of fast idling and a tip should be 2 ± 1 mm.
2. If malfunction of a vacuum drive is suspected, at first check up the electromagnetic block as it is described later in this Section.
3. The drive can be checked up by means of the vacuum pump. (The engine should be muffled), disconnect a vacuum hose from a drive and attach to it the vacuum pump. At pressure 500 мБар the drive should move a rope so that the lever has concerned the screw of adjustment of fast idling. If it not so, the vacuum drive is possibly faulty.


 CHECK AND ADJUSTMENT - FUEL PUMP LUCAS

1. Turns of fast idling it is established at factory on the test bed and cannot be adjusted.
2. On the idle engine and with the lever of fast idling in a starting position, accurately enter a rope of fast idling.
3. Place a tip on a rope so that the distance between edge of the lever of fast idling and a tip was equal 2 ± 1 mm.
4. Correctly having placed a tip, tighten a nut.
5. The drive can be checked up, being guided by paragraphs in Section Removal, installation, check and adjustment of a thermodrive and a rope of fast idling, but pay attention that the lever of fast idling should concern the terminator, instead of the screw of adjustment of fast idling.

THE ELECTROMAGNETIC VALVE

 REMOVAL

1. On engines F8Q 620, the electromagnetic valve is on a partition in an impellent compartment, near to the block of management of preheat. On engines F8Q with turbocharger, it is in an impellent compartment on the top forward rack.
2. Disconnect conducting and disconnect vacuum hoses from the electromagnetic valve.
3. Loosen the two screws of fastening also get the valve.


 INSTALLATION

1. Make installation in return sequence. Watch that vacuum hoses and electroconducting have been reliably connected. Tighten screws.


 CHECK

1. Remove the electromagnetic valve as it is described above.
2. Try to blow air through one of connections of a vacuum hose. Air through the valve should not pass.
3. Connect a food (12В) to plugs of a winding of the valve and again try to blow through the valve air. Now air should pass.
4. If the valve does not work as is described, it is necessary to replace it.