Renault Megane, Scenic

Since 1996 of release

Repair and car operation



Reno Megan, Stsenik
+ Cars of mark Renault Megane
+ Maintenance service
+ Engine repair
+ System of cooling, heating
- Power supply systems, release
   - Fuel and an exhaust system - petrol models
      Removal and installation - assemblage of the air filter and inlet air lines
      The general description of a control system in temperature of air (the central injection)
      Removal, installation and adjustment of a rope of a pedal of gas
      Removal and installation of a pedal of an accelerator
      The general description and use unleaded gasoline
      The general description of system of injection of fuel
      Depressurization of system of injection of fuel
      Removal and installation топливоподкачивающего the pump
      Removal and installation of the gauge of a stock of fuel
      Removal and installation of a fuel tank
      Removal and installation of the case of a throttle
      Check and adjustment of system of injection of fuel
      Removal and installation of components of system of the central injection
      Removal and installation of components of system of the distributed injection
      Removal and installation of the inlet pipeline and final collector
      Removal and installation of final system
   + Fuel and exhaust systems - diesel models
   + Systems of decrease in toxicity of the fulfilled gases
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
3bf7a351




Removal and installation of the case of a throttle

 REMOVAL

1. Depressurize fuel system, address to Section Depressurization of system of injection of fuel.
2. Disconnect a cable of weight from the battery (address to the Head the Electric equipment of the engine for models Scenic), and further operate as it is described in corresponding to subsection.


If the autoradio tape recorder in your car is coded before to disconnect the battery, be convinced that you know a code.

ENGINES E7J

 REMOVAL

1. Remove assemblage of the air filter as Removal and installation - assemblage of the air filter and inlet air lines is described in Section.

2a. Compress fixing bolts and disconnect sockets of electroconducting from the gauge of temperature of air.

2b. Compress fixing bolts and disconnect sockets of electroconducting from a potentiometer throttle заслонки and the step-by-step motor of management of idling turns (address to illustrations).

3. Loosen the скобы also disconnect топливоподающие and returnable hoses to prevent leak and dust and dirt hit.
4. Disconnect a rope of a pedal of gas from sector throttle заслонки.
5. Turn on and remove bolts, fastening assemblage of the case of a throttle to the inlet pipeline, then remove assemblage and a lining. Will throw out a lining - it is subject to replacement.

ENGINES K7M AND F3R

 REMOVAL

1. Turn away strengthening core between domes of racks of a forward suspension bracket.
2. Remove an air line between the case of a throttle and the air filter, address to Section Removal and installation - assemblage of the air filter and inlet air lines.
3. Disconnect a rope of a pedal of gas from sector throttle заслонки. On models with automatic transmission also disconnect conducting of the gauge of compulsory return switching of transfer. Disconnect a rope of a pedal of gas from an arm, but track, that скоба adjustments remained in a flute.

4a. Disconnect conducting from a potentiometer throttle заслонки.

4b. Disconnect conducting from the step-by-step motor of management of idling turns (address to illustrations). Where it is applied, disconnect a vacuum hose of the valve recycling the fulfilled gases.

5. On models with engine F3R, let out from fastenings and remove a plastic cover of a plait of wires from the top part of the inlet pipeline. Disconnect sockets of electroconducting from injectors and take away a plait of wires from the throttle case.
6. Turn away fixing bolts and remove the case of a throttle from the inlet pipeline. Will throw out a lining - it is subject to replacement.

ALL ENGINES

 REMOVAL

1. Remove assemblage of the air filter as Removal and installation - assemblage of the air filter and inlet air lines is described in Section.
2. Compress fixing скобы and disconnect sockets of electroconducting from the gauge of temperature of air, a potentiometer throttle заслонки and the step-by-step motor of management of idling.
3. Disconnect a rope of a pedal of gas from sector throttle заслонки.
4. Disconnect a ventilation hose картера from the throttle case.
5. Use suitable clips, передавите two hoses of system of cooling in the throttle case, then disconnect them. Alternatively merge a liquid from cooling system as Maintenance service is described in the Head.
6. Turn away bolts, fastening assemblage of the case of a throttle to the inlet pipeline, then remove assemblage together with a lining. Will throw out a lining - it is subject to replacement.

ENGINES E7J

 INSTALLATION

1. Clear combined surfaces of the case of a throttle and the inlet pipeline.
2. Make installation in return sequence, use a new lining and check up adjustment of a rope of a pedal of gas, address to Section Removal, installation and adjustment of a rope of a pedal of gas. On models with engine F7R, if necessary fill cooling system as Maintenance service is described in the Head.