Renault Megane, Scenic

Since 1996 of release

Repair and car operation



Reno Megan, Stsenik
+ Cars of mark Renault Megane
+ Maintenance service
+ Engine repair
+ System of cooling, heating
+ Power supply systems, release
+ Engine electric equipment
+ Coupling
- Transmission
   - Manual box of a gear change (Manual transmission)
      Oil replacement in transmissions
      Adjustment of the mechanism of a gear change
      Removal and installation of the mechanism of a gear change
      Replacement of epiploons
      Serviceability check, removal and installation of the switch of lanterns of a backing
      Removal and installation of a drive of a speedometer
      Removal and transmission installation
      The general description of a partition of a manual box of a gear change
   + Automatic transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
3bf7a351




Serviceability check, removal and installation of the switch of lanterns of a backing

 CHECK

1. The chain of lanterns of a backing becomes isolated the switch плунжерного the type, screwed in the left wall картера transmissions, near to a power shaft. If the chain is faulty, check up, whether has fused the fuse.
2. Disconnect a socket of electroconducting and, using a multimeter (in a mode of measurement of resistance) or a diagnostic chain (a lamp and a battery connected by wires), be convinced that the current between switch plugs passes only at a backing choice. If it not and thus in a chain is not present breakages, the switch is faulty and should be replaced.


 REMOVAL

1. Cock a manual brake, then поддомкратьте a forward part of the car and establish it on axial props.
2. Where is available, remove the bottom guard of the engine.
3. Disconnect an electroconducting socket, then turn out the switch from transmission together with a sealing washer.


 INSTALLATION

1. Establish on the switch a new sealing washer, then screw it in картер transmissions and tighten reliably. Connect a socket of electroconducting and check up chain work. Establish a guard of the engine and lower the car on the earth. If at switch removal oil has flowed out, check up its level.